Home
Contact
All jobs
About
Help
Login
Tradesman register
Hide menu

Shower renovation

17-04-2016 | Kleinmond

The shower is presently not covered with tiles. There is a special wall cover consisting of a mixture of sand, mussel shells and plaster which is sealed. The existing wall has a crack which has to be repaired. Afterwords the walls have to be plastered with a waterproof plaster and painted with waterproofed paint. The bottom of the shower has to be tiled with new tiles. Size 8 qm plaster and painting 2 m2 tiling.

Read more
  • Shower renovation - Skills required: Tiling Bathroom Tiling
Material by:
Tradesman
First day of work:
asap
City:
Kleinmond
Postal code:
7195

2 Tradesmen responded to this job

Tradesman Score Verified Association Distance Member since
Amin building Renovations (Pty) LTD
8.0
Gold
National Homebuilders Registration Council 55 km 03-11-2015
Reliable construction company, pvt ltd.
9.0
Gold
74 km 03-10-2013